Getting a new roof when you already have solar

Reviewed by Jarrod Osborne, founder and president of Solar Source (CA license #925231), installing solar in Southern California since 2008.

Installers mounting solar panels on a tile roof

If your roof needs replacing and it has solar panels on it, you’ll need to remove the solar panels for the new roof and put them back on after. Done right, it’s routine. Done wrong, it’s how leaks and dead panels happen.

Who to call first

Call your solar company before your roofer starts. Disconnecting a solar system is electrical work, and many panel and inverter warranties require a qualified installer to remove and reinstall it. Most of our removal and reinstall jobs start with a call from the homeowner or the roofer, and we coordinate the schedule with them directly.

How we remove solar panels for a new roof

We shut the system down safely and document how it’s laid out, with photos and a test of each panel. Then we take the panels, racking and wiring off the roof and store everything, either on site in your garage or at our shop.

Your roofer replaces the roof. When the new roof is on, we reinstall the system with new flashing and attachments rated for your roof type, so the penetrations are sealed for the life of the new roof. We test the system, schedule the city inspection, and turn it back on.

How long it takes

Removal is usually one day. Reinstall is one to two days, plus the inspection. The bigger variable is the roofer’s schedule. While the panels are off, your system isn’t producing, so we try to keep that window short.

Things to decide while the panels are off

  • Whether to add a battery. The roof is open and the system is already being permitted, so it’s a good time.
  • Whether to add panels. Keep in mind that a larger expansion can move an older net metering plan to the current one. We’ll check before you decide.
  • Whether any equipment is aging out. Old string inverters are often worth replacing during a reinstall.

What it costs to remove solar panels for a new roof

Cost depends on how many panels you have, your roof type (tile takes more care than shingle), and whether anything needs replacing. We quote it after we see the system. If your roofer has included solar removal in their quote, ask who’s actually doing that part and whether they’re licensed for it.

Solar Source holds California licenses in solar, electrical and roofing, and has been removing and reinstalling systems across Southern California since 2008. We work on systems we didn’t install.

Remove solar panels for a new roof: common questions

Who removes solar panels for a roof replacement?

Your solar company, not usually the roofer. Disconnecting a system is electrical work, and many panel and inverter warranties require a qualified installer to remove and reinstall it.

How long does it take to remove and reinstall solar panels?

Removal is usually one day. Reinstall is one to two days, plus the city inspection. The roofer’s schedule is the bigger variable.

How much does it cost to remove solar panels for a new roof?

It depends on how many panels you have, your roof type and whether anything needs replacing. We quote it after we see the system.

Should I add a battery while the panels are off?

It’s a good time. The roof is open and the system is already being permitted.

Re-roofing soon? Call 562.852.5626 or get a free quote and we’ll coordinate with your roofer.

Related: Solar panel removal and reinstallation · Add-ons and battery upgrades

Questions about your system?