Most homeowners expect the install to take the longest. It doesn’t. A standard-size home usually takes a day or two on the roof. The permit, the city inspection and SCE’s permission to operate (PTO) make up most of the timeline. Here’s how each step works in Long Beach, Lakewood and Orange County, and what speeds it up or slows it down.
The steps from signed contract to switched on
- Design. We design the system from your roof and your last 12 months of SCE bills.
- City permit. We submit the plans and pull the building permit.
- SCE interconnection application. We file it with SCE so the utility can review your system.
- Installation. Our own crew installs the panels, battery and electrical work.
- City inspection. An inspector checks the work against the permit and code.
- Permission to operate (PTO). SCE approves the system to run. Then we turn it on.
Solar permits in Long Beach
Long Beach takes residential solar permits through its online portal. Rooftop systems that meet the city’s solar checklist can use an over-the-counter permit, which skips a detailed engineering review. Once the work is done, the city inspects it and signs off at final inspection.
Solar permits in Lakewood
Lakewood uses SolarAPP+, an automated online permitting platform. Standard residential rooftop solar and battery systems that meet its requirements can get a permit right away. Systems that don’t qualify go through the city’s regular plan check.
Solar permits in Huntington Beach and Orange County
Under California’s SB 379, cities with more than 5,000 residents must offer instant, online permitting for standard home solar and solar-plus-battery systems. That covers Huntington Beach, Los Alamitos, Cypress, Garden Grove, Westminster and most of Orange County. Systems that don’t fit the standard path, like ground mounts or systems needing structural work, take longer.
How long SCE takes to grant PTO
After the city signs off, SCE reviews the system and grants permission to operate. That review can take anywhere from a couple of weeks to a couple of months, depending on SCE’s workload and whether your home needs a meter change or a service upgrade. We file the paperwork as soon as the city signs off and stay on SCE until PTO comes through.
Don’t turn your system on before PTO. Running it early can violate your interconnection agreement.
What slows a solar project down
- An HOA review. California law gives an HOA 45 days to respond in writing.
- A main panel upgrade. Older or full electrical panels sometimes need to be replaced, which can involve SCE.
- Structural review. Flat roofs, carports and ground mounts may need engineering.
- Re-roofing. If your roof needs replacing soon, do it first. Here’s how to plan solar around a new roof.
- A leased system. If you’re adding to a leased system, the leasing company has to approve it.
Why timing matters this year
California’s property tax exclusion for new solar ends for systems completed after December 31, 2026. Because permits, inspection and PTO are partly out of anyone’s control, no installer can promise a December finish. Here’s what that means for your home.
Frequently asked questions
How long does it take to go solar in Long Beach?
The install itself usually takes a day or two for a standard-size home. Permits, the city inspection and SCE’s permission to operate make up most of the timeline.
What is PTO for solar?
Permission to operate. It’s SCE’s approval to turn your system on and connect it to the grid.
Can I turn my solar on before PTO?
No. Wait for SCE’s approval. Running the system early can violate your interconnection agreement.
Do I pull the solar permit myself?
No. We pull the permit, schedule the inspection and file SCE’s interconnection paperwork.
Does a battery take longer to permit?
Not usually. Long Beach, Lakewood and Orange County cities permit standard solar-plus-battery systems through the same process.
Why homeowners call Solar Source
We’re a family-owned solar and electrical contractor, installing solar and batteries across Southern California since 2008. We handle the permit, the inspection and SCE for you, and our own crews do the work. No subcontractors. We’re an Enphase Platinum Installer with over 1,000 systems installed. $0 down financing is available.
Get a free quote or call (562) 852-5626.
Sources
- City of Long Beach, Solar permit: https://longbeach.gov/lbcd/building/permit-center/solar-permit/
- City of Lakewood, Solar permitting for homes: https://www.lakewoodca.gov/Development-Services/Building/Solar-Permitting-for-Homes
- Solar Power World, California’s SB 379 instant online solar permitting: https://www.solarpowerworldonline.com/2022/09/california-cities-and-counties-now-required-to-switch-to-instant-online-residential-solar-permitting-by-2024/
- Davis-Stirling, HOA solar energy systems (Civil Code section 714): https://www.davis-stirling.com/HOME/S/Solar-Energy-Systems