Does my ADU need solar? California’s rules for 2026

Reviewed by Jarrod Osborne, founder and president of Solar Source (CA license #925231), installing solar in Southern California since 2008.

Rendering of a modern home with rooftop solar panels, illustrating ADU solar requirements

If you’re building an ADU in Long Beach or anywhere in California, the ADU solar requirements are probably on your plan checker’s list. Whether you actually need it depends on one question: is the ADU detached or attached?

ADU solar requirements: the short answer

A newly built detached ADU needs its own new solar system under the California Energy Code. An attached ADU is treated as an addition to the main house, so solar is not required. The rule comes from the California Energy Commission, and your city enforces it when it reviews the permit.

What counts as detached

A detached ADU is a separate structure: a backyard cottage, a new unit over a detached garage, a standalone unit on the side of the lot. If it has its own walls and roof and doesn’t share a wall with the main house, plan on solar.

An attached ADU shares a wall with the house or is built inside it. Garage conversions sit in the middle. Converting an attached garage is usually treated as an addition. Converting a detached garage can be treated differently. Your plan checker makes the final call, so we confirm it with them before we size anything.

Can the ADU use the solar on the main house?

Not as it stands. Solar that’s already on your roof doesn’t satisfy the requirement. What does work in many cases is adding new panels to the existing system on the same lot, as long as SCE approves the expansion and the new panels are part of the ADU permit. That can be cheaper than a separate system, and it keeps one inverter setup and one monitoring app.

If your main house is on an older net metering plan, adding panels can change that plan. We check this before we recommend it, because the wrong expansion can cost you more over 20 years than it saves today.

How big does the ADU system need to be?

The required size is set by a formula based on the ADU’s square footage and climate zone. For most backyard ADUs in coastal Southern California, that works out to a small system, often just a few kilowatts. The calculation is part of the energy compliance report your designer or Title 24 consultant prepares. We can work from that report or run the numbers with you.

ADU solar requirements for batteries

The current Energy Code also asks new detached ADUs to be battery-ready, meaning the panel and wiring are set up so a battery can be added later without tearing things apart. ADUs with a small electrical service of 125 amps or less are exempt from that part. Installing a battery at the start also satisfies it.

In SCE territory, adding the battery now usually makes sense anyway. Under net billing, SCE pays very little for the solar you export, so storing your daytime power and using it in the evening is where the savings come from.

When to bring us in

Early. The best time is while your plans are still being drawn, so the roof layout, electrical panel and conduit runs are designed with solar in mind. Retrofitting after framing costs more and sometimes means a second inspection.

Solar Source has designed and installed solar and battery systems across Southern California since 2008. We hold California licenses in solar, electrical and roofing, and we work with homeowners, architects and builders on ADUs regularly. Our own crews do the work.

ADU solar requirements in California: common questions

Does an ADU need solar in California?

A newly built detached ADU needs its own new solar system under the California Energy Code. An attached ADU is treated as an addition to the main house, so solar isn’t required.

Can my ADU use the solar on my main house?

Not as it stands. In many cases, adding new panels to the existing system works, if SCE approves the expansion and the panels are part of the ADU permit.

How big does an ADU solar system need to be?

It’s set by a formula based on the ADU’s square footage and climate zone. For most backyard ADUs in coastal Southern California, that’s a small system, often a few kilowatts.

Does an ADU need a battery?

New detached ADUs need to be battery-ready. ADUs with 125-amp or smaller service are exempt from that part, and installing a battery at the start also satisfies it.

Building an ADU? Call us at 562.852.5626 or get a free quote and we’ll tell you exactly what your plan checker will want.

Related: ADU solar installation · California Title 24 solar requirements · Solar for new construction and renovations

Rules referenced are from the California Energy Commission’s 2025 Energy Code guidance for ADUs. Requirements can vary with your project details, so confirm with your local building department.

Questions about your system?