ADU solar and batteries
If you’re building a detached ADU in California, the Energy Code generally requires it to have its own new solar system. Attached ADUs are treated as additions, so solar usually isn’t required. We design ADU systems that satisfy the plan checker, fit the roof and make sense for the people who will live there.
Since 2008
Installing solar in Southern California
1,000+
Systems installed
Platinum
Enphase Platinum Installer
CA & NV
Licensed in California (#925231) and Nevada (#0091701)
The rules in short
Generally need their own new solar system, sized to the code requirement.
Treated as additions, so solar usually isn't required.
Plan the wiring and panel space for a battery, or install one up front.
What we do on an ADU
Common questions
It can. If the main house is on an older net metering plan, adding panels can move it to the current plan. We check this first, because the wrong choice can cost more over 20 years than it saves up front.
While the ADU plans are still being drawn. Designing solar in costs less than retrofitting it after framing.